Shutdown 2014-06

Tasks completed during Shutdown 2014-06:

  • Backup to Data SuperCell
  • Install GPU nodes: Dell team will be on-site
  • Re-do GPU node power cabling
  • BIOS updates for all Intel nodes
  • Update Univa Grid Engine to 8.1.7p5 (from 8.1.7p0)
  • Fix Mellanox IB interface settings
  • Update HA storage software: kernel, Mellanox Infiniband drivers, High-Availability Clustering software
  • restructure Lustre directories: soft links, rename base mount