Shutdown 2014-06
Tasks completed during Shutdown 2014-06:
- Backup to Data SuperCell
- Install GPU nodes: Dell team will be on-site
- Re-do GPU node power cabling
- BIOS updates for all Intel nodes
- Update Univa Grid Engine to 8.1.7p5 (from 8.1.7p0)
- Fix Mellanox IB interface settings
- Update HA storage software: kernel, Mellanox Infiniband drivers, High-Availability Clustering software
- restructure Lustre directories: soft links, rename base mount